🌍 Florescecne منذ 1992 ⭐ 34+ سنة خبرة في الصناعة ✓ المورد النخبة المحقق
✓ المورد النخبة المحقق
القائمة
Verified Project Evidence

Project Cases

Explore 8 verified marine fender and airbag project cases across 8 countries/regions and 8 application sectors, covering submarine berthing, container and bulk cargo terminals, tugboat protection, STS transfer, ship-to-berth protection, salvage and refloating, ship launching/docking, and port infrastructure upgrade.

8+حالات موثقة
8الدول والمناطق
8قطاعات التطبيق
100%معدل التسليم في الوقت المحدد

قصص نجاح العملاء

فلتر حسب الصناعة أو السوق أو نوع المنتج للعثور على حالة تنفيذ مماثلة.

8 حالة معروضة
AE
Modern High-Capacity Berths, Container & Bulk Cargo Terminals, High-Tidal Range Ports, and Large Vessel Mooring Protection.منتج

Container Terminal, LNG/Tanker Offshore Berth Authorities

Delivered maximum energy absorption even at large berthing angles, ensuring safe mooring for ultra-large container ships (ULCS), Maintained stable low reaction forces, protecting concrete quay wall structures from dynamic impact fatigue.

35 UnitsQuantity
15–20 Years under severe, high-frequency commercial berthing operations.Duration
SG
Heavy-duty Tugboat Bow, Stern, and Side Protection for High-Frequency Harbor Escort, Push-Pull Operations, and Offshore Vessel Berthing. Designed to absorb severe impact energy and minimize hull wear during continuous contact with cargo ships and tankers.منتج

Ship Management, shipyard

Superior Impact Absorption & Protection: Delivered exceptional energy absorption while maintaining low reaction force, successfully safeguarding both the tugboat structure and assisted vessels from high-impact damage during offshore escorting. Zero Structural Failure: Maintained high structural integrity and elasticity over prolonged high-frequency operation without cracking, tearing, or permanent deformation. Reduced Operational Downtime & Costs: Significantly lowered vessel maintenance overheads and fender replacement cycles, ensuring an estimated 30% reduction in long-term fleet maintenance expenditure.

30 PcsQuantity
8-10 years under continuous high-load operations in harsh marine environments (resistant to salt spray, UV degradation, extreme temperature fluctuations, and severe mechanical friction).Duration
MT
Ship to Ship, STS, STDمنتج

Offshore Oil and Gas Supply Company

Smooth Ship-to-Ship (STS) Transfers, Ultimate Safety Buffer in Rough Seas, Reliable Offshore Fender Performance, Enhanced STS Transfer Efficiency, Reduced Dynamic Berthing Impact

4pcsQuantity
8-12 yearsDuration
DO
Heavy-duty Ship-to-Berth (STQ/STD) protection for 100,000 DWT cargo vessels. Installed directly along quay walls, jetties, and berths to absorb high-energy impacts and maintain a safe stand-off distance during vessel mooring and berthing operations.منتج

Port Infrastructure Construction

100% Safe Berthing Operations: Successfully facilitated the safe mooring of 100,000 DWT large cargo ships off the quay wall, absorbing severe hydrodynamic impact energy without damage to vessel hulls or jetty structures.

60 PcsQuantity
8-10 years under continuous high-frequency quay berthing operations in harsh marine environments.Duration
RO
Shallow & Deep-Water Boat Salvage, Sunken Vessel Refloating, Heavy Marine Wreck Lifting, and Emergency Buoyancy Support.منتج

Marine Salavge Company

Successful Sunken Vessel Refloating, Efficient Marine Salvage Operation, Reliable Heavy Lifting Capacity, Safe Underwater Buoyancy Recovery, Reduced Project Operation Cost

10 UnitsQuantity
6–8 years under regular marine salvage and heavy-lifting conditions.Duration
BR
Heavy-Duty Ship Launching, ship landing/docking, marine salvageمنتج

Shipyard, shipbuilding, ship repair

Successfully completed the safe slipway launching of 13 barges in Brazil without any operational delays or hull damage, Zero Air Leakage & High Durability, Cost-Effective Slipway Solution

13 Units/D2.5*L15mQuantity
8-10 Years under regular marine launching and slipway operational conditions.Duration
CR
Heavy-Duty Port Infrastructure Upgrade, Container Terminal Berthing, Large Vessel Quay Protection, and High-Energy Impact Energy Absorption.منتج

Port & Terminal Contractor

Safeguarded both large cargo vessels and port quay structures against structural damage over decades of operation, Ensured smooth, reliable, and continuous berthing for high-capacity vessels at the upgraded port facility.

20 UnitsQuantity
10-15 Years under high-frequency vessel berthing and harsh tropical marine environments.Duration
لا توجد حالات مطابقة. جرب تغيير الفلاتر.

لديك مشروع مماثل؟

شارك ظروف موقعك والأبعاد المطلوبة والتطبيق. سيوصي فريق الهندسة بحلول مناسبة.

حالة المشروع