Verified field cases in underground mining, rock drilling, and tunneling, demonstrating drilling footage, service life, wear resistance, and stable performance under actual site conditions.

4+حالات موثقة
1الدول والمناطق
3قطاعات التطبيق
100%معدل التسليم في الوقت المحدد

قصص نجاح العملاء

فلتر حسب الصناعة أو السوق أو نوع المنتج للعثور على حالة تنفيذ مماثلة.

4 حالة معروضة
GLOBAL
Underground rock drilling & tunnelingمنتج

Mining enterprise

Drilling in ore face and muck face. Some rods fractured early due to faulty valve of jumbo. Stable performance, good overall quality.

8 pcs drill rodsQuantity
each drill rod is differentDuration
GLOBAL
Underground rock drilling & tunnelingمنتج

Mining enterprise

Total drilling length 5926.5m. Most rods failed by thread wear or fracture. 2 rods trapped and scrapped abnormally. Overall quality is good, performance could be better without human factors.

8 pcs drill rodsQuantity
each drill rod is differentDuration
GLOBAL
Drilling blast‑holes for mine roadway excavation. Monitor penetration rate, hole accuracy and bit wear & loss; evaluate drilling performance, wear resistance and overall service life under actual site conditionsمنتج

Underground mining construction contractor in South America

Drilling time ranged from 0.30‑0.41 min per meter. Main wear mode was matrix wear with no premature button failure. Drilling performance remained stable without premature failure or excessive wear; penetration rate stayed at original level. Good durability and wear resistance achieved; bits were fit for subsequent drilling operations.

Test model: 45‑R32 threaded button bit, insert diameter 46.76 mm, 9 buttons. Completed 4 advance rounds with 70 blast‑holes per face. Right‑arm bit total drilling footage: 320 m; Left‑arm bit total drilling footage: 335 m. Overall total drilled depth: 655Quantity
4 advance rounds completed in field test. Right‑arm bit: 320 m, all buttons intact, estimated remaining service for 1‑2 additional advances. Left‑arm bit: 335 m, 1 button missing, estimated remaining service for 1 additional advanceDuration